The adjacent North Parking Lot will be closed, which together with the space cleared by the removal of the old terminal, will allow new ramp space to be constructed with parking positions for up to four aircraft.
In a previous posting from 06Jul17: AEP - Old Terminal + Parking Lot = New Ramp Space the editor of this blog reported that the existing Terminal B structure would be extended northwards with five new jetways once the parking lot closed (see diagram above) but it appears that there are no plans for any such construction in the near future.
In addition, the military sector, which is currently southeast of the terminals will be relocated to make room for 2-3 more parking positions for commercial aircraft.
Sources:
http://www.siscoma.com.ar/online/aviacion/2017/avn170921/avn-170921.html
In addition, the military sector, which is currently southeast of the terminals will be relocated to make room for 2-3 more parking positions for commercial aircraft.
Sources:
http://www.siscoma.com.ar/online/aviacion/2017/avn170921/avn-170921.html
No comments:
Post a Comment